New assembly hall for WILCO laboratory testing equipment

The positive sales development of the inspection machines led to space problems in the assembly department. Fortunately, a suitable solution was quickly found in the immediate vicinity. From now on, the assembly of WILCO laboratory testing equipment will take place 300 meters from the main location in the new plant 2.

Since the launch of the NEO family in 2019, sales of laboratory test equipment have developed very encouragingly. In recent months, the demand for large inspection machines has also increased, leading to space problems in WILCO's assembly facilities. To solve this, alternatives were sought. After a short time, an existing hall with office space could be rented.

Complete logistics at one location

At Rigackerstrasse 2, the new assembly and office workplaces were occupied. From now on, the complete assembly of the laboratory test equipment takes place there. In addition, all necessary material is centrally located. This optimizes the assembly processes and increases productivity. Customer acceptance tests of the lab testing equipment will also take place at the new location in the future.

Perfect infrastructure

In addition to the assembly shop, the 400 square meters include four office workplaces, a meeting room and a small canteen. This means that the necessary specialists are directly on site and can work together more efficiently. 

Share this on